Gas Turbines
New York Presbyterian Hospital, 68th Street Campus, NYC, NY, 2005
- (1) 7,200 KW gas turbine-generator power plant with 185 PSIG steam heat recovery.
- Phase I of the Project included complete preliminary design engineering and various alternative project Cost estimates.
- Phase II currently in design and will be completed August 2006. This Phase includes detailed mechanical and electrical design engineering, permitting assistance,
- Phase III, Project construction observation and Technical Start-up services will begin in September 2006.
- Total project Value $20,000,000
Blythe Energy Project, Blythe, CA, 2002
- 520 MW natural gas fueled combined cycle facility. Provided Electrical and Mechanical permitting services for Siemen’s Energy and Automation. These services were directed at the California Building Official from the California Energy Commission. Siemens built all of the control modules for two gas turbines, one steam turbine, three generators, facility MCC’s and the cooling towers.
- In addition, we provided UL (third party) certification of all modules.
- $540,000,000 Total Project Value
CalPeak, various sites in California, 2002
- Developed (7) 50MW Pratt & Whitney FT-8 Twin Pac, gas turbine generator projects as part of the California Independent System Operator’s, Summer Reliability Program. Obtained 10 year capacity contracts the California Department of Water Resources.
- (4) Sites in San Diego Gas and Electric territory, (3) sites in Pacific Gas and Electric’s territory. Each site had gas compression, water treatment, inlet fogging and SCR.
- $179,000,000 Total Project Value
Wellhead Power Panoche, Fresno, CA, 2001
- 50MW Pratt & Whitney FT-8 Twin Pac, gas turbine generator with gas compression, water treatment, inlet fogging system and SCR.
- Design Assistance
- $30,000,000 Total Project Value
Fresno Cogeneration Partners, Fresno, CA, 2001
- 25MW Pratt & Whitney FT-8 Power Pac, gas turbine generator with gas compression, water treatment, inlet fogging system and SCR.
- Design Assistance
- $30,000,000 Total Project Value
Santa Maria Cogen, Inc., Santa Maria, CA, 1998
- 9 MW Gas Turbine Power Plant with steam heat recovery for a 900 Ton Aqueous Ammonia Absorption Refrigeration Unit.
- Performed design services to enhance thermal utilization by adding a brine water evaporator, ice making facility and thermal delivery pipeline.
- Design Services
- $500,000 Total Project Value
Lundy Thagard, Los Angles, CA, 1988
- 3 MW Gas Turbine, Cogeneration
- Mechanical Design Review
- $3,500,000 Total Project Value
Citizen's Utilities, Lake Havasu City, AZ, 1989
- 30 MW Gas Turbine, Peaking Plant
- Remanufactured Turbine Feasibility Study
- $30,000,000 Total Project Value
Yuba City Cogen, Sun Sweet Growers, Yuba City, CA, 1990
- 50 MW, w/ HRSG and Absorption Chilling
- Inlet Air Cooling Technical Evaluation
- Mechanical Design Review and Support
- $55,000,000 Total Project Value
|